The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Qingdao Hilong Machinery Co., Ltd. -

Aluminum Framed ALU|RAS Concrete Wall Formwork Panels ;;; 130;0 / Piece; 00:09; Early Stripping Concrete Slab Panel Formwork K deck System ;;; k|deck aluminium slab ;;;

K-Stage Slab & Access Archives - KHK Scaffolding & Formwork

WINSTON SCAFFOLDING PTY LTD· AUSTRALIA· 44_46 Gould Street, South N·S·W· 2136· Tel: 0061_29758 8700 Fax: 0061_297587263

Gulf Construction Online - Meva systems help Iranian

The slabs are poured using the MevaDec slab formwork applying the drop-head-beam-panel method. The drop head allows for early stripping, that is the props remain under the poured slabs while the panels and beams can be removed early for the next slab. Thus the site needs two sets of props but only one set of panels and beams to do all the slab ...

MevaDec: Efficient, panelised slab formwork

The slab formwork system MevaDec is the efficient, flexible, hand,set slab solution crane,independent use. Suitable for any slab , with integrated facing in panels or seperate facing sheet. It allows you to change forming direction, since it has no fixed grid. 1 System, 3 methods, for any slab| Drop,head , beam , panel method with early stripping

Slab formwork MevaDec - MEVA Formwork

The MevaDec drop head (lowers the primary beams and panels by 19 cm) makes early stripping possible, thus allowing optimised material stock on the construction site as well as rapid construction progress. The beams and panels can be stripped effortlessly and used for the next pouring cycle. It is thus possible to complete a slab in three days.

BEAMDECK The Aluminium Beam Slab Formwork with Drophead for

BEAMDECK Aluminium Beam Slab Formwork 111248 15:700 1134 1200 64 112 1 8 0 111254 8:800 2034 2100 1 8 0 64 112 111108 22:900 2967 3000 64 112 1 8 0 111260 8:440Cross Beam BD 210 For standard fields| Note With integrated timber nailing strip| 1134 1200 64 1 7 5 111284 4:850Cross Beam BD 120 For thicker slabs and filler areas| Note With |||

Good Formwork for Homes| Concrete Construction

The slabs are poured using the MevaDec slab formwork and applying the drop-head-beam-panel method. The drop head allows for early stripping; the props remain under the poured slabs while the panels and beams can be removed early for the next slab. Thus the site needs two sets of props but only one set of panels and beams to do the entire slab jobs.

single page max cataloge V1 26 02 16 - Max Aluminium Formwork

Unimax International is an established organization in Aluminium Formwork System serving the construction industry with updated and customized solutions which are environment friendly; An ISO 9001!2008 certified company having two state-of-the-Art manufacturing units each in Sonepat` Haryana as well as

Panel floor formwork Dokadek 20 - The Formwork

42 Floor formwork around edges 52 Early stripping without drop head without activation of the slab 54 Additional areas of use 54 Sloping slabs 58 Additional precautions for slab thicknesses of up to 50 cm 62 General remarks 62 Transporting, stacking and storing 74 Cleaning and care of your equipment 76 Reshoring props, concrete technology and ...