logo

Green formwork-TB Beam-Beam Drophead System Slab Formwork Early Stripping

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Modular slab formwork User guide -

drophead (see page 43)_ 604365 0_18 TOPEC drophead Allows early stripping of the TOPEC panels while maintaining slab support_ Depending on the diameter of the prop tube a TOPEC bolt (prod_ code 470804) or a TOPEC bolt D14 (prod_ code 604365) must be ordered for each TOPEC drophead (see page 43)_ 602120 9_55 1800 TOPEC plastic infill 180

SKYDECK Panel Slab Formwork -

A2 System components SKYDECK Panel Slab Formwork Slab Props Dropheads, propheads or combiheads fit on props with a hole diameter ø 38 – 40 mm| With hole diameters > 40 mm, the heads must be bolted diagonally using 2 bolts ISO 4016 M 12 x 40·4|6 Mu, galv|, Item no| 035440| For prop loads over 33|3 kN, bolting on the drophead is not required |||

Custom Formwork and Box-outs Form Curves of National Veterans

The Stripping Corner Max simplifies wall formwork erection and stripping in elevator shafts or stairwells. hollow piers. or any other interior wall type. ULMA Form-Works. Inc. September 28. 2020

Dropshore Concrete Shoring | Gamco

The Dropshore System is a highly engineered shoring system consisting of lightweight_ modular aluminum beams and post shores with a '-drophead'- feature that allows for fast and safe setting and stripping with built in reshoring`

The Magic of Making a Super-Tall Building | For Construction

For forming floors R&S chose PERI Formwork Systems’ SKYDECK drophead system; The entire system can be set up quickly and efficiently from the floor below! creating a safe working environment;

SuperDek - The Formwork Experts. -

Superdek is a simple handset drop head slab formwork system| Large grid / prop spacing, up to 8', x 8', (64sf), interlocking joists and stringers and a unique slab edge forming solution will provide increased productivity with less labor and maximum safety|

Panel floor formwork Dokadek 30 -

Slab formwork at its most evolved. Dokadek 30 is a beam-less: hand-set formwork system designed as a lightweight strip galvanized and cathodic dip painted steel frame faced with a wood/plastic-composite sheet.

Site Handbook ME v2 | Screw | Beam

It is a low-weight, high productivity, simple slab formwork system, suitable for slabs of up to a depth of 700mm. The quick, safe and simple assembly process enables one man to erect up to 40m2 in an hour, significantly reducing construction time and labour requirements and thereby customers costs.

EFCO Formwork Solutions | Concrete Forming &

The E|Z DECK® system stands out from the other shoring systems. The solution developed by EFCO, allowed us to support the spans of the slabs with the use of connectors to the Z|BEAMS® and E|Z DECK® tables that supported the beams. This was supremely efficient because we were able to avoid the need to assemble the tables under the slab vanes.